Homerton, Undergraduate Student Accommodation 'South Court'

Client
Homerton College Cambridge University
Value
Phase 2 £2.5m
Status
Complete

Saunders Boston were appointed along with the D&B main contractor following the successful completion of the first phase of this student accommodation development.   Phase 2 doubled the amount of accommodation creating 138 bedrooms this time specifically for undergraduate students.

The 138 Bedrooms over 4 floors are designed as undergraduate accommodation during term time and are then available for business courses during the vacation periods.  Unlike the first phase, this building is modular construction utilising a pre-finished concrete panel system that reduced time on site which accelerated the programme.  Architecturally this was well concealed in the elevation treatment which appeared to be a traditional yet contemporary solution with a combination of red brick, timber and copper.

« Return to sector listings

Eastern Gate House
119 Newmarket Road
Cambridge
CB5 8HA

Also in Exeter:
The Generator
The Gallery
King's Wharf
The Quay
Exeter
EX2 4AN



t.Cambridge: 01223 367733 Exeter 01392 348627
e.office@saundersboston.co.uk